6
Units are shipped from the factory ready for horizontal
airflow. If conversion to vertical airflow is necessary, pro-
ceed as follows:
1. Cut insulation around bottom openings and remove
panels from the bottom of the unit, saving the screws
holding the panels in place.
2. From the rear of the unit, remove the four screws
securing the blower assembly in place and loosen the
two screws directly below the duct opening (Figure 4).
3. Remove the clamp securing the blower assembly to the
bottom of the unit. The clamp and screws may be
discarded (Figure 5).
4. Rotate the blower assembly 90° clockwise, setting the
blower assembly outlet on the bottom of the unit and
secure with two screws removed in step 2 (Figure 6) .
5. Tighten the two screws below the duct opening that
were loosened in step 2.
Remove
Loosen
Figure 4
Duct Removal
Airflow
Remove
Figure 5
Clamp Removal
Airflow
Install
Screws
Removed
From
Back
Panel
Figure 6
Vertical Blower Assembly
Use the Horizontal Duct Cover Kit (CHK001A) to complete
the conversion.
For 24, 30, 36, and 42 Models:
1. Remove and set aside the four supply air side screws
(Figure 7).
2. Remove and set aside the two return air side screws.
3. Center flange bracket (Figure 8) and unit openings.
Attach flange brackets to the unit using the removed
screws in Step 1. Retighten screws.
4. Drill two 1/8” diameter holes on the return air side as
indicated in Figure 8.
5. Secure the return air side flange bracket with the two
self-tapping screws included with the unit.
RETURN AIRSUPPLY AIR
REMOVE
SCREWS
REMOVE
SCREWS
Figure 7
Supply Air Side Screws Location
Drill 2-1/8"
ø
holes
FLANGE BRACKETS
SUPPLY AIR RETURN AIR
Figure 8
Flange Bracket Location